View Single Post
  #10  
Old 12-19-2006, 04:03 PM
bizon bizon is offline
Senior Member
 
Join Date: Dec 2006
Posts: 102
bizon is on a distinguished road
Default

at least a day.
depending on the shape of the car though it can take less or more. If its a one off design it could take up to 3 days. If we are doing quite a few of the same car with the same design we can do 3 a day (thats with about five experienced guys).

Materials to wrap a car cost quite a bit more than $50 sorry garth even if you do buy in bulk.
Reply With Quote